Phase Two of House Revamping: Complete!

So the trim (being skirting and doorframes) is done! I’ve only done the hall-side of the door frames, seeing as the other sides will be painted as the rooms are painted, and I kind of want to paint the rooms before I do all the trim (i.e. paint the bedroom walls before the door frames). That way I can go around each room and do all the trim in one go.

Before (as seen in my last blog entry):
Hallway - After 1st Coat :) (by !Terri!)

After (taken when it’s dark outside so it’s dark in here – used the flash though!):
Hallway Phase 2 - Complete! (by !Terri!)
Hallway Phase 2 - Complete! (by !Terri!)
Hallway Phase 2 - Complete! (by !Terri!)